Scaffold Boards & Netting

Boarding and Containment for Planned Access Systems

Scaffold Boards Netting support two different parts of a planned scaffold system: boards form working platforms, while netting can help contain light debris. MacBlair groups both within its site equipment range. Selection must follow the scaffold design, intended duty, bay dimensions and the competent contractor's specification. Boards and netting must be compatible with the complete access arrangement, not chosen in isolation.

 

Boards should be fully supported, properly restrained and free from splits, excessive wear or damaged end bands. Platform width and board overhang must follow the system design; HSE guidance notes that excessive overhang should be avoided. Netting introduces wind loading, so it must never be added to an existing scaffold without informing the designer or contractor responsible for its stability. Board ends should sit over their supports as specified rather than floating between structural members.

 

Scaffold Boards Netting cannot replace guardrails, toe boards, brick guards or other required fall and falling-object controls. Platforms need safe access and should be kept clear of loose materials and trip hazards. Inspect the scaffold after erection, substantial alteration and events that could affect stability, including high winds. Only competent people should erect, alter, inspect or dismantle the structure. Loading bays and ladder access points need their own controls within the scaffold plan.

 

Store boards flat, supported and away from persistent moisture or contamination. Fold or roll netting to prevent tears and inspect ties and edges before reuse. Site fencing can help control ground-level access, while the wider health and safety range supports other measures identified by the scaffold and site plans. Never reuse a component when its condition or previous loading history is uncertain.

Scaffold Boards and Netting FAQs

No. Netting increases wind loading and can change the forces on the structure. The scaffold designer or contractor must know it will be fitted so the scaffold can be checked and designed for those loads.

Overhang must follow the scaffold design and board system. HSE guidance says boards should not overhang excessively and gives no more than four times the board thickness as an example, but the competent scaffold specification takes priority.

Working platforms should be fully boarded and wide enough for the task and access. HSE guidance states general working platforms are usually at least 600 mm wide, subject to the scaffold design and intended duty.

No. Netting can assist with containment, but it does not replace the edge protection and falling-object controls required by the scaffold design and risk assessment.

Inspect components before use and as part of the scaffold inspection regime, including after substantial alteration or adverse weather. Remove split, weakened or badly contaminated boards and torn or damaged netting from service.