MacBlair Builers Merchant
MacBlair Builers Merchant

Res-Tec GRP Roof 1010 Catalyst

8009a

Res-Tec GRP Roof 1010 Catalyst

8009a

For most conditions catalyst should be added between 1.5 and 2.5%. For very cold temperatures 2-4% is typical, and for very warm conditions 1.0-1.5% is typical. As a working guide 2% catalyst will give approximately 85 mins working time at 5°C and 11mins at 30°C. Adjust the catalyst level up or down to obtain the desired pot life and cure. Never add less than 1% or more than 4% as full cured properties will not be achieved.

Pack Sizes: 1 Kg, 5Kg

The RES-TEC Roofing Systems are available across our entire branch network

 

Have a question?
Please click here to submit your inquiry about this product and we will be in touch.